old paeroa hospital - An Overview
From the seventies the Paeroa manufacturing facility was upgraded, raising the floor Room to 1,one hundred fifteen sq. metres (12,000 sq ft). All over this time, a different spring water pipe was positioned involving the Paeroa manufacturing unit along with the Railway Reserve, which pumped filtered Paeroa spring water, enabling the public to dri